$0 Pakistan → Australia Skilled Migration Guide — Quick-Start Checklist

Australia Visa Cost and Processing Time from Pakistan (2026)

Migration from Pakistan to Australia is one of the most expensive professional investments a Pakistani family will make — and it is almost universally underestimated in advance. The official visa application charge is only one part of a multi-stage expenditure that begins months before the visa is lodged. The full journey from document preparation to grant can span 18–30 months. Here is what the full cost looks like in 2026, converted to Pakistani Rupees at current exchange rates.

The True Total: What You Are Actually Spending

Most Pakistani applicants who search for "Australia visa cost" find the visa application charge (VAC) figure and treat it as the total. The VAC for a primary Subclass 189 or 190 applicant is approximately AUD 4,910. For a spouse included in the application, budget the current additional-applicant charge separately and verify it in ImmiAccount before lodgement. For children under 18, verify the applicable charge at the same time.

But the VAC is the last payment you make. Before you get there, you will have already spent the equivalent of that amount on the pipeline stages.

Expense Item Cost (AUD) Approx. PKR
ACS Skills Assessment (IT) 1,450 290,000
Engineers Australia Assessment 1,500 300,000
VETASSESS Professional Assessment 900–1,200 180,000–240,000
PTE Academic exam 350 70,000
NAATI CCL Urdu test 814 162,800
HEC degree attestation N/A 10,000–30,000
IBCC certificate verification N/A 10,000–20,000
Police character certificate (per province) N/A 3,000–8,000
Medical examination (per adult) ~400 80,000
Subclass 189/190 visa — primary applicant 4,910 982,000
Subclass 189/190 visa — spouse Verify current additional-applicant charge Verify current charge
Subclass 189/190 visa — child under 18 Verify current charge Verify current charge
Migration agent fees (if using) 3,000–5,000 600,000–1,000,000

DIY total for a single applicant: approximately AUD 7,000+ (PKR 1.4 million+), depending on which assessing authority applies and whether you need to resit PTE.

DIY total for a couple: approximately AUD 9,500–11,000 (PKR 1.9–2.2 million at approximately 200/1).

This is before any relocation costs, first month's rent, or the settlement funds that some states require as evidence for the state nomination application.

The PKR Volatility Problem

The Pakistani Rupee has devalued sharply against the Australian Dollar over the past three years. The same ACS assessment that cost PKR 180,000 in 2022 now costs approximately PKR 290,000 at an exchange rate of about 200 PKR per AUD. This matters in two specific ways:

Savings goals shift: If you began saving for migration in 2023 with a PKR target based on 2022 exchange rates, you are likely short. Revisit your PKR budget based on current AUD/PKR rates.

Settlement funds for state nomination: Several Australian states require proof of liquid assets as part of the state nomination application (South Australia and Tasmania both have settlement fund requirements). These thresholds are set in AUD and must be demonstrated in your Pakistani bank account at the time of nomination. A sudden 5–8% PKR devaluation between when you plan your nomination and when you submit can push you below the threshold.

The strategic response is to convert a portion of your migration fund to AUD or USD in a foreign currency account as early as possible, insulating yourself from further PKR movement.

The Processing Timeline: 18–30 Months from Start to Visa Grant

Pakistani applicants should plan for an 18–30 month timeline from starting document preparation to receiving a visa grant. Here is how that breaks down:

Months 1–6 (Foundation):

  • Obtain NADRA Computerized Birth Certificates and update Family Registration Certificate (FRC)
  • Begin HEC attestation for degrees (15–20 working days per document, often longer with portal delays)
  • Obtain IBCC attestation for Matriculation and Intermediate certificates
  • Begin intensive PTE preparation

Months 3–8 (Language and Assessment):

  • Sit PTE Academic — allow for one or two resits to reach 79+ in all components
  • Sit NAATI CCL Urdu once PTE preparation is solid (results take 4–6 weeks)
  • Lodge skills assessment with ACS, Engineers Australia, or VETASSESS once HEC documents are ready

Months 5–10 (Skills Assessment Processing):

  • ACS: 2–4 months
  • Engineers Australia: 3–5 months
  • VETASSESS: 3–5 months
  • Compile employment reference letters during this period — do not wait for a positive outcome

Months 8–12 (EOI Lodgement):

  • Lodge Expression of Interest in SkillSelect immediately upon receiving a positive skills assessment
  • Research state nomination requirements for your target states
  • Apply for state nomination if eligible

Months 10–18 (Waiting for Invitation):

  • Invitation timing depends on your points score, occupation, state, and invitation round. Higher-scoring profiles may receive invitations sooner; lower scores may wait 12 months or longer.

After Invitation (60-day window):

  • You have 60 calendar days from the invitation date to lodge the full visa application and pay the VAC
  • Book medical examinations at IOM Islamabad, Karachi, or Lahore immediately — appointments are heavily booked
  • Compile police clearance certificates for all provinces where you have lived for 12+ months

Post-Lodgement Processing:

  • For Pakistani applicants, allow approximately 8–12 months for a final decision on Subclass 189/190. Background and security checks can extend the timeline, so confirm the current Department of Home Affairs processing-time estimate before lodging.

Free Download

Get the Pakistan → Australia Skilled Migration Guide — Quick-Start Checklist

Everything in this article as a printable checklist — plus action plans and reference guides you can start using today.

Costs You Cannot Avoid vs Costs You Can Control

Cannot avoid: Visa application charge, medical examinations, police clearances, HEC attestation, one language test sitting, skills assessment fee.

Can control:

  • PTE resit costs (prepare thoroughly before each attempt — each resit is AUD 350)
  • NAATI CCL resit costs (AUD 814 each attempt — structured preparation before your first attempt is essential)
  • Migration agent fees — the DIY route is viable with proper research and preparation, which is exactly what a structured guide provides

The single most expensive avoidable cost is a visa refusal. The visa application charge is non-refundable. A Subclass 189 refusal due to a documentation error costs the primary applicant approximately AUD 4,910 with nothing to show for it. This is why the early stages — HEC attestation sequence, employment reference letters that align with ANZSCO, and financial evidence for VETASSESS — deserve meticulous attention before money is spent on the visa itself.


The Pakistan → Australia Skilled Migration Guide includes a full cost tracker with PKR equivalents for each stage, a timeline planner calibrated to the Pakistani documentation process, and a pre-lodgement checklist to reduce refusal risk.

Get Your Free Pakistan → Australia Skilled Migration Guide — Quick-Start Checklist

Download the Pakistan → Australia Skilled Migration Guide — Quick-Start Checklist — a printable guide with checklists, scripts, and action plans you can start using today.

Learn More →